User Acceptance Test Plan For Mobile Application (Template)

Here in this posted the template for UAT for mobile application hope this will be help full for preparing UAT

Stage: Acceptance

User Acceptance Test (UAT) Plan

 

Application Name 

 

Document Version: [1.0]

Date: [dd/mm/yy]

Contents

1Document Management

1.1Contributors

Please provide details of all contributors to this document.

Role Department Name
Owner Company name

Contributor <Business Partner>
Contributor <Business Partner>
Contributor <Business Partner>

1.2Version Control

Date Version Author Section Amendment
12/11/2011 V 1.0 Varun

All Initial Draft

2USER ACCEPTANCE TESTING

2.1User Acceptance Definition

2.2UAT Responsibilities

Role Name Responsibilities
Project Manager name

Communication with Customer to agree format and scope of UAT
Agree acceptance criteria with the Customer prior to commencing UAT
Business Analyst name

Assist Customer with the creation of a detailed test plan
Test Co-ordinator (Business) Varun

Ensure that a detailed test plan is available for test users
Ensure that bugs identified during UAT are logged in the MIS Test Log
Ensure testing takes place within agreed timeframes

3UAT STRATEGY

The User Acceptance Test Plan should be used to record the Customer’s sign off of the documented scenarios. It is recommended that detailed test plans be used to record the results of user testing.

The document is a high level guide, and is not intended as a replacement for any specific user acceptance testing procedures that individual areas might have.

Consideration

Date Agreed

Details

Test Approach

Assumptions & Constraints

Setup of Test Environment

Test Scenarios

Test Period

4USER TESTING

User testing should be based on the pre agreed test scenarios or acceptance criteria. It should be noted if the scenarios have been sourced from the BRD, or if they have been identified subsequently.

Identified in BRD
Scenario Date Tested Notes
Identified Post BRD
Scenario Date Tested Notes

Any issues identified during UAT should be added to the MIS Test Log. It may be agreed that UAT can be signed off while some issues remain – please add the test log reference to the appropriate section above if this is the case.

5UAT RESULTS

5.1Open Issues

Please insert a copy of any open issues from the Test Log, together with details of why these issues remain open at the sign off of the Acceptance Stage.


5.2Document Sign Off

Business Project Manager Name
Project Manager Name

 

This template will more useful for creating mobile application UAT Doc.